• welcome zhejiang shangneng boiler co., ltd.telphone:

    0575-82190417

  • details
  • performance
  • advantages


    shangneng acme cejw electrode hot water boiler working principle

    ● the acme cejw type electrode hot water boiler is a kind of immersed electrode design. it uses the high thermal resistance and selective electrolyte of water. it uses high voltage electrode to heat water and converts electrical energy into heat energy directly. water device. it works mainly by controlling concentric shields on both sides of the electrode plate.

    24p金铜-电极锅炉6 副本.jpg

    in summary, adjusting the relative position of the shield c and the electrode a can regulate the heating power of the electrode-type hot water boiler.



    1. efficient

    ● it can convert 100% of electric energy into heat energy;

    ● it can start quickly, and can reach full-load operation from cold start within 15~20 minutes. in the hot start state, it only takes 1 minute to reach full heating supply;

    ● automatic operation, simple temperature control operation, stepless adjustment, can provide more efficient and stable thermal energy supply.


    2. economy

    ● saved the need for fuel pipelines, savings equipment, energy savers, and emission control equipment;

    ● the equipped automatic control equipment reduces the operator's demand;

    ● it can be connected with the heat exchanger to isolate the conversion of the original boiler treatment system and the system hot water, saving water treatment costs.


    3. energy saving

    ● effectively solve the problem of heating and heating of gas shortages and expensive oil areas;

    ● direct heating of water through high-voltage electricity, using the advantage of electricity price to provide users with a steady stream of heat.


    4. security

    ● eliminates exhaust pollution such as combustion and smoke, and the need for fuel pipelines and savings equipment;

    ● once the water level inside the boiler is too low, the circuit will automatically cut off. there is no dry burning phenomenon similar to that caused by the lack of water in conventional boilers;

    ● shangneng·acme cejw high pressure immersed electrode type hot water boiler provides equipment with maximum safety with minimal component configuration and simplified electrical control.


    5. supporting

    ● it can be combined with one or more heat exchangers and thermal deposit systems to form an integrated heating system to provide users with more economical heating and heating equipment.


    6. environmental protection

    ● no burning, no fuel smoke, fly ash and other pollution problems, clean and zero emissions;

    ● no noise, quiet operation.

    ● shangneng acme cejw type electrode hot water boiler fully responds to the national call for energy saving and emission reduction.


    1. no arc generated

    when an electrode in an acme cejw type electrode-type hot water boiler is inserted into water, the water generates a current which generates heat directly in the water, and there is no arc generating position.

    ● the acme cejw type electrode hot water boiler can avoid the arc-rising risk of the jet boiler by designing high-precision control of boiler water low conductivity and boiler output;

    ● the jet boiler needs to use teflon coating (the material will peel off with time) in the cylinder to prevent arcing.


    2. not hydrogen explosion

    ● in the working process of acme cejw type electrode hot water boiler, the low current of the boiler water is 0.15a/cm (the jet boiler's current value is 1-2a/cm, cejw value is only ten in one part), the concentration of hydrogen generated during operation of the boiler is not higher than 1-3 ppb;

    ● the boiler is immersed and the system is fully water-filled and there will be no hydrogen evolution.

    ● in summary, there is no possibility of hydrogen explosion in the shangneng acme cejw electrode hot water boiler.


    3. power regulation

    ● power regulation range: 10%-100%, stepless energy regulation can be achieved within this range, and with fast adjustment performance;

    ● thermal efficiency:> 99.5%, the measured thermal efficiency of the boiler is 99.8%, and the thermal efficiency of the system during the lifetime is ≥ 98%;

    ● can be increased from the minimum heat supply to the maximum heat supply or vice versa within 60 seconds;

    ● start-up time: with good start-up control function, the rated design temperature can be reached within 8-10 minutes under full-load operation.


    4. short startup time

    ● the cold start time of the acme cejw type electrode hot water boiler is short, from the water temperature of 20°c to the design water temperature of less than 20 minutes.


    5. unattended operation

    ● the automatic control device equipped with acme cejw type electrode hot water boiler can realize complete automatic control, and has the functions of manual and automatic control.

    ● the boiler has process automation functions such as program control, automatic heating, overheat protection, compound adjustment and shutdown, which can ensure the safe operation of the boiler and enable unattended operation.

0.2155s
网站地图